Sports center Wichterheer, Oberhofen am Thunersee

Within 7 months the building, built in 1977, was extended and the existing technical installations were completely complemented or renewed.

The existing 25-m swimmer pool and the 18.5-m non-swimmer pool were completely retiled and equipped with completely new pool water systems.

A new attractive paddling pool for small children and an indoor slide with light show with a length of 56 m were built.

Outside there is a playground and an outside slide with a length of 68 m.

The wellness area with sauna facility was completely redesigned.

The fitness room with 315 m2 and the group fitness room with 155 m2 have been integrated into the extension building.

Owner

Sportzentrum Wichterheer AG

Architect

Rychner Zeltner Architekten

Period

Study 2014
Realisation 2017

Nature of the building project

Renovation

Type of building

Swimming pool

Our services

  • Technical planning for heating, ventilation, sanitary and pool water systems
  • Construction management for heating, ventilation, sanitary and pool water systems
  • Construction coordination

Trades

Heating

Ventilation

Sanitary

Pool water systems